TL;DR: 365 MW redundant dual-tower capacity · Targeting a ~4x acquisition-cost spread (illustrative, forward-looking, not guaranteed)

Energycapitalx Infrastructure (ECXI) · Southern California site · Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Specialized cloud and cybersecurity platform targeting a global market projected to exceed $250B by 2027, with a diversified, multi-service revenue model.
Cybersecurity strategy, IT due diligence, cyberattack response, and technology platform assessments
Cloud Infrastructure-as-a-Service (IaaS) and Secured Private Cloud (SPC) hosting for enterprise-grade resilience
Acquiring and integrating complementary cybersecurity companies to build scale and market position
Target expansion of training programs, IaaS offerings, and physical data center infrastructure (subject to financing and execution)
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Demand drivers include ~63% of breaches tied to third-party vendors and AI workload growth targeted at 20%+ within 12 months.
C-suite officers and board members require risk presented as a clear, quantifiable business metric rather than a technical report. Many existing security tools do not translate risk into the business language of probability and impact that executives use to make decisions.
Approximately 63% of breaches are traced to third-party vendors. As supply chains grow more interconnected, demand for automated, continuous vendor risk scoring is rising.
Data center operators anticipate AI computing workloads rising 20% or more within 12 months. Forward-looking industry projections (illustrative, not guaranteed) point to AI-driven power demand growing roughly 30x by 2035, increasing the need for secure, scalable AI-ready infrastructure.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: A 365 MW locally anchored campus targeting materially lower inference latency for the Southern California market.
San Clemente and the broader Orange County market have historically experienced AI generation latency, a direct consequence of limited local data center infrastructure. When AI compute requests originate in Orange County and route to data centers in Los Angeles, Phoenix, or Northern Virginia, cumulative round-trip latency can degrade model performance, inference speed, and real-time application responsiveness.
The root causes are twofold: a limited base of local critical IT capacity, and Southern California power costs that have historically constrained data center development. Few projects have addressed both constraints at sufficient scale to materially change regional compute capacity.
ECXI 0 is designed to address both root causes. The 365 MW campus introduces locally anchored compute capacity intended to serve regional AI inference, model training, and enterprise colocation demand without cross-regional routing. At full build-out, the project is targeted to represent a meaningful addition to regional compute supply.
The fiber infrastructure strategy is intended to complement the latency objective. Diverse, redundant fiber pathways are planned to reduce exposure to local traffic chokepoints. Network design will be finalized once the analysis confirms whether observed latency stems from bandwidth limitations or traffic routing inefficiencies.
The project team has identified proximity to a major regional life-sciences and technology campus, San Diego's high-tech, biotech, and scientific research hub, as a potential demand driver. The AI and computational research needs of that community represent a near-term prospective tenant base for ECXI 0 capacity. Forward-looking, not guaranteed.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Forward-looking statements are illustrative and not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com

TL;DR: Phased, stage-gated build-out. Each stage is funded and de-risked before the next begins, with a single-digit-percent share of total capex committed to the initial stage.
1,000 sq ft facility in Tennessee, active today for developing and staging high-density compute and network assets
High-density lab data center, under 1 MW
Letter of intent secured for a fully entitled data center campus available for near-term production deployment, subject to definitive agreements.
Activation targeted mid-2026, ~400,000 sq ft (phase 1)
Build-out targeted 2026–2028, ~2,280,000 sq ft (~5.7x phase 1 footprint)
Two ~200,000 sq ft, five-story towers in Orange County, California, with ~65 MW of planned capacity and a capitalization structure in the single-digit-percent range of total program capex
Adjacent to a ~4,000 MW transmission line serving Camp Pendleton Marine Corps Base

INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Cross-functional leadership spanning consulting, security, capital markets, and engineering.
Many organizations find it difficult to translate technical cybersecurity findings into business-risk language that boards and executives can act on. Existing offerings often sit at one extreme: highly technical outputs or high-level assessments with limited operational detail.
Ethical hacking has historically relied heavily on manual, tool-assisted workflows with lengthy reporting cycles. ECX's AI-assisted platform is designed to reduce that cycle time and improve consistency. Projected efficiency gains are forward-looking targets, not guaranteed outcomes.
C-suite leaders and board members who need cybersecurity risk expressed as a business metric to support governance and oversight decisions.
Large organizations with complex vendor ecosystems and multi-cloud environments that require continuous risk scoring and third-party security management.
Financial services, healthcare, and government contractors subject to cybersecurity framework requirements and regulatory oversight.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~350K-user base acquired via a strategic investment; channel-led distribution through VAR and MSP partners.
Energycapitalx goes to market through Value Added Resellers (VAR) and Managed Service Providers (MSP), including a partnership with a leading enterprise IT solutions provider and a strategic managed-services partner. SKUs are assigned across the product portfolio for streamlined partner distribution and revenue attribution.
The strategic investment provides immediate B2C/B2B market access to a base of ~350,000 users. ECX leverages this acquired base alongside Web3 assets (a mobile app and browser plugin) to provide the UI/UX layer for Cipherbit IaaS, with the aim of reducing customer acquisition costs relative to cold-channel benchmarks (target, not guaranteed).
ECX is developing Cipherbit Security™, a crowd-sourced security program that broadens access to specialist cybersecurity talent. The service provides a no-cost initial assessment for prospects and links a fractional virtual CISO (chief information security officer) to each engagement, aiming to make enterprise-grade security accessible to organizations of a wide range of sizes.
Using a bug bounty model, Cipherbit Security™ engages global security researchers to continuously identify and report vulnerabilities, offering an always-on alternative to periodic point-in-time penetration testing.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Real-time, probability-weighted risk quantification at asset level, reported in financial terms.
Cipherbit transforms raw security device events into probabilistic risk elements, delivering real-time calculation, modeling, and reporting on a minute-by-minute, hourly, daily, and monthly basis.
Risk is tied directly to individual assets, giving security analysts an actionable remediation list while finance stakeholders receive risk expressed in financial-impact terms.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
GP/GC Integration Strategy — Margin Internalization & Capital Structure
TL;DR: Illustrative committed-capital ratio of ~307:1 to the project SPV · Target return metrics subject to definitive offering documents
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~307:1 committed-capital-to-project-cost ratio on entitled land with ~4x power-cost spread versus the Southern California market average.
Zoning is in place (M1), with no discretionary approvals or rezoning applications identified as required. Building permit submission is targeted to begin upon finalization of the tenant improvement (TI) scope. Projects requiring rezoning typically add an estimated 18–36 months of calendar risk.
The site is described as having access to four 1,000 MW transmission lines from the San Onofre corridor, plus dual utility circuits on-site. Access to transmission capacity is a primary constraint in data center development, and the site's access profile is presented as a differentiating attribute, subject to utility confirmation.
Projected power pricing of approximately 12–16¢/kWh compares with a market average of approximately 32¢/kWh, an illustrative spread of roughly 2–2.7x. Pricing is forward-looking, not guaranteed, and subject to definitive utility and offtake agreements.
Committed project-level capital equals approximately 307:1 relative to the Phase 1 SPV base capital reference. The Phase 1 sequencing approach (land, then core/shell, then tenant TI) is designed to align capital deployment with risk reduction at each stage. Target return metrics are illustrative and subject to definitive offering documents.
The ECXI 0 opportunity reflects an identified supply gap: limited availability of AI-ready compute capacity in Southern California. The site combines entitled industrial land, transmission infrastructure access, and a utility rate profile that, if realized, would differ materially from the regional market. Outcomes depend on execution, tenant demand, and utility arrangements, and no return is assured.

Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. This material is for informational purposes only, does not constitute an offer to sell or a solicitation of an offer to buy any security, and is subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
Parcel size in San Clemente, Orange County, CA
Heavy Industrial, permitting data center development within existing entitlements
Approximate depth below ground level, making aggregate pier foundations viable
Engineering estimate above baseline construction costs

The physical structure on 5.77 acres of M1-zoned land provides tangible collateral value and potential sale-leaseback optionality, subject to market conditions and definitive documentation.
Sale-leaseback proceeds are modeled at roughly 1/10 of total project capitalization as an illustrative liquidity lever.
The 365 MW critical IT load capacity is designed to support IaaS (Infrastructure-as-a-Service) revenue from enterprise, hyperscale, cluster rental, and AI tenants.
Illustrative target: revenue scale-up of roughly 3.4x from launch year to the forward-looking 2028 exit horizon. Projections are not guaranteed.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room · Subject to definitive offering documents
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Active/active 2N twin-tower design · ~2x fault-domain redundancy · bedrock at ~25 ft supports an estimated ~5% structural premium over baseline.
The campus master plan is built around a redundant pair of data center towers — Tower A and Tower B — operating in an active/active fault-tolerant configuration. This 2N distributed redundancy model is a widely referenced architecture for hyperscale and AI-compute deployments: if one tower experiences a failure, the paired tower is designed to sustain the critical load. This is a target design objective, not a guarantee of uninterrupted operation. Both towers are designed to operate concurrently and to support each other's load.
Each tower is planned at seven total levels: two sub-grade floors and five above-grade floors. The sub-grade levels use the site's natural topography to locate heavy mechanical and power infrastructure below street level, addressing community noise, air quality, and aesthetic considerations. The above-grade levels are designed for high white-space density, hardened security, and operational efficiency.
The foundation system leverages favorable geology: bedrock at approximately 25 feet below grade. This supports the use of aggregate pier foundations, a stable and cost-effective approach for multi-story heavy infrastructure. The estimated structural premium for this approach is approximately 5% above baseline costs, based on preliminary engineering and subject to final design. Comparable urban infill sites often require deep pile or complex mat systems, which can add materially to structural budgets (illustrative range, not site-specific).
The compact 5.77-acre footprint requires high lot coverage and carefully engineered perimeter security. Heat rejection, physical security setbacks, and utility easement management will require disciplined site planning. Density considerations are weighed against the power access and entitlement profile of the site.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room · Subject to definitive offering documents
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Two-tower active/active design with 4 dedicated white-space floors (~57% of above-grade program) and sub-grade power and cooling infrastructure.
The deepest sub-grade level is dedicated to primary backup power generation. Natural gas generators are housed within a two-foot thick reinforced concrete walled underground enclosure, engineered to strict noise attenuation and air quality standards. This sub-grade placement reduces the visual and acoustic impact of traditional surface-mounted generator systems, supporting community relations and permitting. Fuel cell integration is anticipated as a supplemental and transitional power source alongside primary gas generation, subject to final engineering and permitting.
The upper sub-grade level serves as the project's mechanical and connectivity spine. High-density liquid cooling heat exchangers occupy the primary volume, supported by main utility feeds including regional electric utility circuits, natural gas transmission line termination points, and fiber optic ingress infrastructure. Diverse, redundant fiber pathways are engineered to reduce single-route dependency and mitigate latency constraints associated with local network chokepoints.
Ground level functions as the secure interface between the outside world and the critical infrastructure above. A hardened mantrap entry system controls all personnel access. The Security Operations Center (SOC) and Network Operations Center (NOC) share this level, providing 24/7 monitoring, incident response, and network management capability. Administrative office space and tenant interface functions keep operational staff physically separated from white-space environments above.
Four full floors of high-density data halls, engineered to accommodate high rack densities required by AI and hyperscale workloads. These levels are designed for active/active redundant operations across both towers, with flexible power distribution architectures supporting redundancy configurations from N+1 to 2N as tenant requirements are finalized. The white-space floors form the revenue-generating core of the campus and are designed for adaptability as compute density requirements evolve.
Illustrative design parameters only. Forward-looking and not guaranteed; subject to definitive offering documents. For further information, contact the Investor Relations team via the data room.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Twin-tower configuration with integrated sub-grade infrastructure, designed for environmental and aesthetic integration in the San Clemente, Orange County, CA setting.
ECXI 0. These visualizations illustrate the "Digistructure" concept, blending functional infrastructure with aesthetic integration into the Southern California landscape.
The twin-tower configuration and integrated sub-grade elements are highlighted, reflecting a commitment to both performance and environmental harmony. Renderings are illustrative and forward-looking; final design is subject to permitting, engineering, and definitive offering documents.



INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Target power rate of ~50% below the SoCal market average (~$0.16 vs. ~$0.32/kWh), implying a ~2x cost advantage at the target rate.
Southern California's utility rates have historically made large-scale data center development in this market economically challenging relative to established markets such as Northern Virginia, Phoenix, or Dallas.
The ECXI 0 investment thesis is premised on the target of negotiating power rates at roughly 38 to 50 percent of the SoCal market average, based on the transmission capacity being activated and right-of-way access to existing regional transmission infrastructure. These rates are targets and illustrative assumptions, not guaranteed outcomes, and remain subject to negotiation with the relevant utility and transmission counterparties.
At the target operating rate and 100% load, annual power OpEx is modeled at a ratio of roughly 1.0x of the illustrative cost base, structured as a pass-through in tenant lease agreements, a standard practice in net-leased colocation and hyperscale contracts. Forward-looking, not guaranteed; subject to definitive offering documents.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Existing M1 (Heavy Industrial) zoning · no rezoning or discretionary entitlement required
M1 — Heavy Industrial. Zoning is in place and uncontested. The M1 designation permits heavy industrial use, including heavy equipment, vehicles, containers, machinery, and custom manufacturing. Data center development, classified as a heavy industrial utility infrastructure use, falls within the M1 envelope and does not require a zone change, conditional use permit reclassification, or general plan amendment.
Targeted near-term execution. Because M1 zoning is already in place, the development path is expected to require building permit applications, plan check review, and construction-phase approvals, with no discretionary entitlement process. Avoiding a rezoning step removes a major source of timeline uncertainty in California land development, where comparable residential or mixed-use projects can face delays of roughly 18 to 36 months. Timing remains forward-looking and is not guaranteed.
Custom design to tenant specifications. A build-to-suit structure allows the development team to align architectural plans, engineering contracts, and construction schedules with confirmed tenant requirements, reducing speculative construction exposure. Once the tenant improvement (TI) deliverables list is finalized with the design engineering team, the project would move into permit submission with a defined scope.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Fully entitled M1 industrial site with no rezoning required, and a low execution risk profile dependent on the building permit path.
For additional information, contact the Investor Relations team via the data room. Figures and projections are illustrative and subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact via Investor Relations data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: By-right M1 entitlement · no discretionary approvals required for the permit path.
M1 (Heavy Industrial) zoning underpins the development thesis for the ECXI 0 data center campus, central to speed-to-market and cost profile.
High-density data centers align with M1 permitted use categories, allowing building permit submission without Planning Commission review or public hearings.
Industrial buffer requirements support operational continuity for a 365 MW campus as surrounding development occurs.
Forward-looking statements and assumptions are illustrative and not guaranteed. Subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: M1 zoning removes most discretionary entitlement risk. The principal exposures are near-term tenant specification finalization and the Phase 2–3 capital path.
While M1 zoning reduces the discretionary entitlement exposure present in alternative sites, the ECXI 0 campus remains subject to standard industrial environmental review, including CEQA assessment for a project of this scale and power consumption. Air quality permitting for sub-grade natural gas generators will require South Coast AQMD review and approval. Early engagement with regulatory agencies is critical to preserving the timeline advantage that M1 zoning provides.
The most immediate execution risk is the absence of finalized tenant improvement deliverables. Engineering and utility counterparties cannot accurately price the project or confirm technical feasibility without a comprehensive deliverables schedule detailing the power split between HVAC and computing loads and the redundancy configuration. Rack layout, office space, parking, and fiber pathway requirements must also be locked before engineering pricing is finalized and before utility rate commitments can be confirmed. Resolving this gap is the highest-priority action item in the development timeline.
Committed capital to the project SPV is approximately 307:1 relative to the Phase 1 reference base, which supports land acquisition and core/shell infrastructure. The gap between Phase 1 capitalization and fully loaded fit-out cost for the full 365 MW build-out represents a significant forward-looking financing requirement. Capital stack sequencing, including committed tenant improvement capital, construction loan terms, and potential co-investment structures, should be clearly defined before construction commences. Illustrative Phase 2–3 funding scenarios are subject to definitive offering documents.
Concentrating 365 MW of critical IT capacity on a 5.77-acre site is an extremely dense configuration. The transition from a multi-acre campus model to an ultra-compact urban infrastructure design requires disciplined site planning, maximum lot coverage, and precisely engineered heat rejection and physical security perimeters. This is achievable with the right engineering team, but it requires an uncompromising commitment to high-density design standards from the outset of the architectural process.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Forward-looking statements are not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Dual utility feeds and diverse fiber pathways engineered for N+1 redundancy at the grid and architectural levels.
Redundant fiber entry points are planned at Level -1, with pathway diversity designed to reduce single points of failure and avoid regional traffic chokepoints. The architecture provides multiple independent routing options to support connectivity resilience independent of any single carrier or physical pathway.
Two independent utility transmission circuits are planned to provide utility-level N+1 redundancy before the project's own architectural redundancy is engaged. This dual-feed approach aligns with Tier IV data center design practice and is intended to protect against single-circuit failure events. Final configuration is subject to utility interconnection agreements.
The adjacent right-of-way from a decommissioned generating station provides access to four existing 1,000 MW transmission lines (4,000 MW aggregate legacy transmission capacity). This corridor access is a differentiating infrastructure attribute among Southern California sites; availability and interconnection terms remain subject to utility and regulatory approval.
A dedicated Network Operations Center (NOC) at Level 1 is planned to provide 24/7 network monitoring, incident response, and connectivity management across both towers. The NOC is designed to be co-located with the Security Operations Center (SOC), enabling unified operational command of network and physical security functions.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room · Subject to definitive offering documents
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Sub-grade liquid cooling designed for AI-density loads of 40–100+ kW per rack, roughly 8–20x traditional enterprise densities.
At 365 MW of critical IT load density across a 5.77-acre site, thermal management is a primary site planning constraint rather than a secondary engineering consideration. Heat rejection requirements for a campus of this scale at standard PUE ratios call for purpose-engineered, high-density liquid cooling that goes well beyond traditional air-cooled CRAC arrangements. AI compute workloads typically operate at 40–100+ kW per rack, versus roughly 5–10 kW for traditional enterprise workloads, which makes conventional air cooling impractical at this density.
The Level -1 design anchors cooling on high-density liquid heat exchangers sized for extreme-density GPU and AI accelerator environments. These systems are designed to support direct liquid cooling, rear-door heat exchangers, and immersion cooling configurations, with final configuration subject to confirmation of tenant rack density requirements through the technical infrastructure (TI) deliverables process.
Locating primary cooling infrastructure at sub-grade Level -1 is a thermal design choice as well as a noise management measure. Sub-grade ground temperatures in Southern California are generally more stable than ambient surface air, which can reduce the temperature differential cooling systems must overcome during peak summer demand. Projected efficiency benefits relative to surface-mounted configurations are forward-looking, not guaranteed, and will be validated through detailed engineering and commissioning.
Sub-grade placement also reduces the visual and acoustic footprint of cooling towers and condensers, which on a 5.77-acre site where perimeter space is constrained for security setbacks and operational access is a material site planning consideration. Heat rejection pathways are being engineered to manage the concentrated thermal load of a 365 MW campus within this footprint, and are a first-order priority in the architectural development process.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Projections are forward-looking and not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: 2N architecture with two independent towers · Active/active operation, both generating revenue
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room · Projections are forward-looking and not guaranteed.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Phase 1 sequences capital deployment against committed tenant demand, with the core and shell representing the majority of development spend and tenant-funded fit-out gating each revenue step.
The Phase 1 roadmap is designed around a single governing principle: limit capital at risk by sequencing investment against committed tenant demand for excess capacity. Development capital for the core and shell is expressed here as a share of the total program rather than as absolute figures, and all sequencing is illustrative and subject to definitive offering documents.
Land acquisition closes first, securing the entitled parcel and starting the development timeline. Core and shell infrastructure, including foundations, sub-grade levels, structural frames for both towers, utility connections, and primary power infrastructure, forms the largest share of development capital and establishes the physical chassis of the campus without committing to full fit-out of all 365 MW.
Tenant-funded fit-out, structured as a capital contribution against executed lease obligations, then fills the racks level by level. Each phase gates to the next based on committed tenant requirements, so capital deployment tracks directly against contractual revenue visibility. Forward-looking targets are not guaranteed.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · For discussion purposes only. Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Four sequenced workstreams gate construction financing — tenant deliverables, power rate commitments, engineering feasibility, and environmental permitting. All targets are forward-looking and subject to definitive offering documents.
The highest-priority action item. Engineering and utility counterparties require exact specifications before they can price the project or confirm feasibility: power usage breakdowns by category (HVAC, computing, lighting), redundancy targets, rack layout requirements, cooling approach by floor, office programming, parking allocations, and fiber pathway specifications. This deliverables list is the master input for every subsequent workstream.
Power pricing is the financial backbone of the investment thesis. Target blended rate structures of roughly 12–16¢/kWh, compared with a market average of approximately 32¢/kWh (a discount of roughly 50–60%), formalized in term sheets or letters of intent before construction financing is syndicated. Transmission capacity and interconnection timelines are being confirmed in parallel. Rate outcomes are not guaranteed.
With tenant TI deliverables in hand, commission a formal structural and MEP feasibility study for the twin-tower configuration on the ~5.8-acre site. The study will confirm the aggregate pier foundation design, sub-grade construction approach, PUE targets, heat rejection requirements, and the basis-of-design documentation required for building permit submission.
Engage the regional air quality management district and the City of San Clemente early on sub-grade generator permitting, air quality management plans, and any CEQA review triggered by project scale. Early agency engagement is the most effective way to protect the schedule advantage provided by M1 zoning. Proactive community outreach on noise and air quality will support a smooth permitting process.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · For investor relations inquiries, contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
Loading, security, staging
High-density racks
Chilled water, CRAH, UPS
Core routers, fiber trunks
Chillers, backup gensets
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Five purpose-built levels · Designed for high-density AI/ML compute · Redundant (2N) power and cooling architecture
Controlled equipment ingress and egress.
High-density AI/ML racks with cold-aisle containment.
Power and cooling systems with 2N redundancy.
Core networking, fiber trunking, cross-connects.
HVAC chillers, backup generators, maintenance access.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Forward-looking information is illustrative and not guaranteed. Subject to definitive offering documents. Contact the Investor Relations team via the data room.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~87% CAGR over five years, with ~22x revenue scale-up from 2024 to 2029 (illustrative, forward-looking, not guaranteed).
Five-year compound annual growth rate across the revenue trajectory
Growth from the 2024 base to 2029
Projections are illustrative targets and are subject to definitive offering documents.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~200 kW per rack, a ~10–20x density premium over standard facilities, and an illustrative ~67% reduction in physical shell cost under the Capital Efficient scenario.
Engineered per-rack power capacity (operating specification)
Over standard 10–20 kW facility configurations
Illustrative reduction in physical shell cost under the Capital Efficient scenario
Target maximum share of CapEx allocated to revenue-generating IT and energy assets
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Three probability-weighted inflection points define the base, upside, and downside cases for LP risk assessment.
The three-inflection-point framework provides a structured probability hierarchy for LP risk assessment. High-probability items anchor the base case, moderate-probability items define the upside scenario, and low-to-moderate failure risks define the downside stress scenario. Each inflection point has distinct monitoring metrics that should be incorporated into periodic LP reporting. This illustrative framework is forward-looking and not guaranteed; outcomes are subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~9x target gross return on secondary prior-generation data-center GPU hardware · Accelerated depreciation concentrated in Years 1–3 (illustrative, subject to definitive offering documents).
On secondary prior-generation data-center GPU hardware, based on acquisition cost, useful life, and achievable rental rates. Illustrative and forward-looking, not guaranteed.
MACRS 5-year class life with bonus depreciation elections (where available, subject to tax counsel review) on the energy and IT asset block.
Front-loaded deductions may generate tax losses that flow through to Limited Partners, depending on individual tax position.
The 39-year real estate shell is separated from the accelerated IT block, concentrating benefits in the capital-constrained early years (target, not guaranteed).
Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Projections are illustrative and forward-looking, not guaranteed. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: DCF-implied enterprise value sits within the target exit range (~1.0–1.6x the lower bound of the range) at an 18% discount rate, with an illustrative 3.0x terminal revenue multiple.
Reflects pre-scale execution risk
Conservative, illustrative
Multiple of the lower bound of the target exit range
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: 200 kW per rack density · Full-scale target online by 2029 · Shell cost is a single-digit-percent share of total campus capital expenditure.
Largest single capital commitment in the platform
Per rack (operating target)
Full scale (forward-looking, not guaranteed)
Of total campus capital expenditure
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room · Subject to definitive offering documents
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~10–20x rack-density advantage vs. legacy facilities; ~67% shell-cost reduction vs. standard-density configurations.
Vertically integrated data center build-out
High-margin software platform
Core density thesis reshaping CapEx-to-revenue
vs. legacy facilities
vs. standard-density configurations
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room · Not an offer to sell or solicitation to buy securities; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~75% lower acquisition cost than replacement value (~4x acquisition-cost spread vs. new list price) with revenue capacity matched to original hardware specification.
vs. replacement value
vs. new list price
Prior-generation data-center GPUs acquired at roughly one-quarter of new list price
Generation capacity remains commensurate with original hardware specification
Accelerated depreciation profile versus new-unit basis
Front-loaded 5-year MACRS deductions during 2024–2026 (outcomes vary by LP)
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Projections are illustrative and forward-looking, not guaranteed. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Roughly 84–95% of total CapEx is allocated to shorter-lived IT and energy assets (5-year MACRS), versus 39-year treatment for the building shell, producing a front-loaded, illustrative tax deduction profile.
IT equipment and energy systems as a share of total CapEx
Foundations, structural steel, and exterior cladding under Section 168
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Execution and hardware obsolescence risks are assessed as low-to-moderate probability, but their combined impact on LP returns is asymmetric.
While the probability of catastrophic failure across both critical risk categories is characterized as low to moderate, the asymmetric impact of these risks on LP returns warrants detailed structural analysis. Execution risk and hardware obsolescence risk are not independent variables; they interact in ways that can amplify downside scenarios beyond what a linear probability-weighted model would suggest. For illustration, an integration delay extending the timeline to full-scale operation by 12–18 months could coincide with an architecture shift that accelerates devaluation of current-generation compute hardware, producing a compounded downside scenario. This illustrative stress case is used to test the model's resilience assumptions and is not a forecast.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Forward-looking statements are illustrative and not guaranteed. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Dual-path grid interconnection + direct Tier 1 carrier peering · Target latency and redundancy KPIs in data room
ECXI 0's strategic location is designed to support integration with both the regional power grid and major network providers. Grid interconnection is intended to support high-reliability power delivery, while direct peering with Tier 1 carriers is intended to provide low-latency access to the global internet backbone, which is important for AI workloads.
This dual-layered connectivity is a core element of the ECXI 0 proposition, intended to offer tenants a dedicated power source alongside diverse, high-speed network routes. Target performance and redundancy metrics are illustrative and forward-looking, not guaranteed; subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Approximately 200 kW per rack across all configurations, with a campus footprint range of ~4.3x between the smallest and largest scenarios.
Fixed capital allocation for energy systems and IT infrastructure, expressed as an order of magnitude; detailed figures are available in the data room
200 kW per rack, consistent across all configurations (operating metric)
Ratio between the largest and smallest campus footprint scenarios (illustrative)
Spread between the lowest and highest all-in project cost scenarios, illustrative and subject to definitive offering documents
Powered shell scenario with the best capital efficiency for structure; target outcome, not guaranteed
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Figures are illustrative and forward-looking, not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~20,000 SF per floor · 5-story tower · modular micro-campus design
Self-contained micro-campus floor plate
Modular scalability within the 5-story architecture
Integrated power distribution across each floor
Two-phase Direct-to-Chip cooling loops
Dedicated high-density computing zones
Illustrative schematic plans; design features are forward-looking and subject to final engineering and definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Vertical density targets for a gigawatt-class campus, with cooling and pollution-prevention design integrated from the outset.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~80% smaller campus footprint with unchanged compute density (~100 kW/rack baseline).
The original 100 kW/rack single-story configuration required brute-force horizontal sprawl, consuming roughly 4,400 acres of land and locking site selection into remote rural areas far from fiber, workforce, and utility interconnects. The Vertical DTC Scenario addresses that constraint. By stacking data halls across five stories and replacing air-based thermal management with two-phase Direct-to-Chip (DTC) cooling, the campus footprint compresses by ~80% while preserving rack count, power density, and compute capacity in this illustrative scenario. Forward-looking estimates are not guaranteed.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: 365 MW critical IT capacity · ~$0.16/kWh target blended power rate · 5.77-acre heavy-industrial site in Southern California
Sized for hyperscale, colocation, and AI workloads
Illustrative, subject to executed agreements
MI (Heavy Industrial) zoned land
Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Forward-looking figures are illustrative and not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: 1 GW campus · 10–20x rack power density vs. legacy facilities · ~84%–95% of total capex deployed in revenue-generating energy and IT systems.
1,000,000,000-watt energy campus engineered for high-density operation
Versus legacy facilities at 10–20 kW per rack
Share of total capital in energy and IT systems
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Forward-looking projections are illustrative and not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: 2.7674 cluster-to-GPU ratio · 378 deployed clusters · 3,024 GPUs (illustrative plan, subject to definitive offering documents)
Compute is organized into fixed, deployable cluster configurations.
A 2.7674 cluster-to-GPU ratio serves as the unit of account for income reporting.
Consistent mapping of rental yields supports illustrative distribution modeling.
The same deployment playbook applies whether scaling to 10 or 300 clusters.
Unit of account for monthly income reporting
Planned deployed clusters
Total GPUs across the portfolio
Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Six GPU SKUs across prior-generation, current-generation and next-generation data-center GPU tiers, designed to diversify yield and reduce exposure to single-SKU demand volatility. Acquisition cost spread across the portfolio is roughly ~4x between secondary-market and new-unit pricing for the interconnect-premium tier.
The portfolio is built around a multi-architecture GPU rental model spanning six distinct SKUs, from established prior-generation hardware to next-generation wholesale hardware. Each tier addresses a specific market need, so that no single SKU's demand cycle determines the portfolio's overall yield envelope. Figures are illustrative operating targets, not guarantees.
Low secondary-market acquisition cost relative to list price. Targets a flat $2.00/hr rental rate, supporting a stable base of foundational cash flows.
Illustrative target of ~9x return multiple on acquisition cost, the most capital-efficient entry point in the portfolio. Forward-looking, not guaranteed.
High-bandwidth interconnect suited to multi-GPU AI training workloads. Targets the highest rental rate in the prior-generation tier, with an estimated ~4x spread between secondary-market and new-unit acquisition cost.
The next-generation tier offers a ~3x uplift in memory bandwidth over the prior generation, supporting premium contract structures. The current-generation tier serves as the established high-performance tier. Both provide exposure to the sovereign AI and frontier model training market.
Targets the highest rental rate in the portfolio. Although current market availability is constrained, this next-generation tier is modeled as the largest contributor to aggregate revenue, with its per-cluster contribution expressed as a share of total portfolio income.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Projections are illustrative and forward-looking, not guaranteed; subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
Next-generation GPU tier on an hourly rate model with a rental ceiling roughly 5x the baseline GPU rate.
Generates the largest share of portfolio revenue in the model.
Limited availability supports premium pricing assumptions.
Current-generation high-memory GPU tier (180–192 GB VRAM) on a fixed monthly wholesale rental model.
Monthly contracts reduce the utilization variance inherent in hourly models.
Fixed-rate agreements support LP-level cash flow modeling and distribution planning.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Returns and valuations are illustrative and subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Roughly 1 in 16 dollars of total project cost sits in the powered shell, which is depreciated over 39 years, while the large majority sits in energy and IT systems that qualify for accelerated depreciation.
Depreciated over 39 years as commercial real estate
Eligible for accelerated depreciation
Illustrative only. Tax treatment depends on final asset classification and applicable law; subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~20,000 racks in a mid-range campus footprint; highest rack count across the three illustrative scenarios.
Highest rack count across the three illustrative scenarios
Mid-range campus configuration


Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Accelerated monthly amortization on compute assets, sized to match high-velocity revenue generation and a ~4x acquisition-cost spread across tiers.
High-performance compute hardware depreciates quickly due to aggressive technological change.
Monthly amortization is front-loaded to match high-velocity revenue generation from compute assets.
GPUs are typically classified as IT equipment subject to 3-to-5-year accelerated depreciation schedules.
Monthly amortized costs are used to evaluate real-time margin performance; figures are forward-looking and not guaranteed.
Relative acquisition cost: Highest tier in portfolio (index 100)
Monthly amortization: Steepest schedule in the portfolio, expressed relative to the Tier 2 schedule
Positioning: Sovereign AI and frontier model training — premium pricing justifies the steep amortization schedule
Relative acquisition cost: ~55% of Tier 1 (used and new pricing both within this band)
Monthly amortization: Approximately half the Tier 1 monthly schedule
Positioning: Current-generation frontier AI training at a more accessible capital entry point than Tier 1
Relative acquisition cost: Lowest per-unit entry point in the portfolio (~1/4 of Tier 1)
Monthly amortization: Lowest per-unit schedule, with cluster-level net contribution driven by the $10.00/hr ceiling rental rate (illustrative, subject to utilization)
Positioning: Highest aggregate revenue potential at cluster scale
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Projections are illustrative and forward-looking, not guaranteed. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
The Tier A configuration presents the most pronounced secondary-market cost advantage in the portfolio, with a ~4x spread between used and new acquisition channels. This spread is the defining characteristic of the capital-efficient tier strategy. Illustrative scenario; subject to definitive offering documents.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Continuous, automated assessment with dollar-denominated risk outputs, designed to support underwriting and board-level decision-making for GPU infrastructure.
Acquiring and hosting GPU compute at scale requires substantial capital, making risk management a boardroom-level priority rather than solely an IT function. Cipherbit IaaS is ECX's core platform offering: a usage-based infrastructure-as-a-service (IaaS) solution that translates raw security telemetry into financial risk intelligence.
Many legacy tools rely on metrics such as CVE scores or SIEM alerts. These measures are useful for technical teams but do not directly answer the financial questions that boards and insurers typically ask. Cipherbit IaaS is designed to bridge that translation gap.
Cipherbit ingests data from firewalls, EDRs, and network monitors deployed across GPU clusters. Through continuous automation, the platform assesses the computing environment around the clock against live threat factors, replacing periodic manual assessments that leave longer exposure windows.
The platform produces illustrative, dollar-denominated estimates of the potential financial impact of each identified vulnerability. These estimates are intended to support due diligence by corporate boards and cyber insurers underwriting GPU infrastructure. Methodology and assumptions are available in the data room.
By integrating directly with the owned Digistructure infrastructure, Cipherbit IaaS is designed to provide visibility across energy systems, fiber networks, compute clusters, and physical security layers, offering a consolidated risk view rather than the point-solution coverage typical of single-category vendors.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Target revenue streams are layered across four components, reinforcing one another at each level of the stack. Figures below are illustrative, forward-looking and not guaranteed.

This synchronization is designed so that extreme-density real estate, an optimized multi-tier GPU cluster topology and a proprietary IaaS platform operate as one system. The target outcome is diversified, compounding revenue streams across each layer of the stack, subject to execution and market conditions and to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Revenue targets grow ~2.2x from the 2027 base to the 2029 Tower A topping milestone and ~3.4x by the 2030 exit window; revenue capped at ~4.4x the 2027 base for compensation purposes post-exit.
Illustrative management targets, forward-looking and not guaranteed. Subject to definitive offering documents.
Assumed as of Q1 2027
SNB fixing, 29 Oct 2026; SNB policy rate 0.00%
Illustrative, before FX hedging cost, fees and withholding
Note: The milestone dates were shifted two years versus the prior 2025–2034 version; other slides may still show prior dates.
Overnight rate definition: https://en.wikipedia.org/wiki/Overnight_rate
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Fund (Cipherbit LP), GP and SPV structure, plus one-line capsule per site/project/SPV, with the Swiss-US overnight-rate arbitrage applied per site; placeholders pending site-level inputs.
Cipherbit LP
Energy Capital LLC, Cipherbit LLC
ECXI, Swiss Innovative Architecture SA
Illustrative and forward-looking, not guaranteed. Subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: A closed-loop security architecture in which each new deployment measurably improves detection and response across the platform, with a compounding intelligence advantage that scales with cluster count.
Forward-looking statements: performance and competitive-advantage statements reflect management expectations and are not guaranteed. Subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
On current revenue
Targeted over 2024–2029
2024–2029 trajectory
Illustrative, forward-looking scenario; not guaranteed.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Footprint spans a ~4.3x range across scenarios, and rack density per 1,000 SF varies roughly 4x. Land and permitting are the primary variables.
Scenario A vs. Scenario B, the largest variance in the dataset
Racks per 1,000 SF across scenarios
Scenario B's compact footprint (indexed at 100) is the preferred configuration. It reduces land requirements, permitting exposure, and utility infrastructure scope, subject to site-specific diligence.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room. Subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Modeled hardware life of 3–5 years per GPU tier, with accelerated amortization that front-loads value recognition ahead of statutory schedules.
3–5 years per GPU tier
Discontinuous AI architecture transitions
Effective revenue life could fall below the 3-year floor
Three-tier hardware diversification
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Three-tier GPU portfolio designed to diversify yield, acquisition-cost exposure, and contract structure.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room. Subject to definitive offering documents. Projections are illustrative and forward-looking, not guaranteed.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Target ~22x revenue scale-up by 2029 and ~77% incremental EBITDA margin by 2027, both illustrative and forward-looking, not guaranteed.
Target scale-up from 2024 to 2029
Target margin projected by 2027
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · ECXII.COM · For Investor Relations contact, use the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
Revenue Trajectory, Fee Economics & the 2028 Strategic Exit
TL;DR: Illustrative ~22x revenue scale-up over the projection period; target exit modeled at a multiple-based range, subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
Organized into standardized, deployable, and manageable compute blocks.
Built around ECXI-AIDC Tower configurations using the "Cluster S" cyber-physical digistructure.
Fixed configurations support predictable, transparent monthly income reporting.
Standardized unit of account for monthly income reporting.
Deployed across the platform.
Across the deployed base.
Investor Briefing · Energycapitalx Infrastructure (ECXI) · ECXII.COM · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Three rack-density scenarios at 1 GW scale, compared on an indexed basis (base = 100) for shell cost and campus footprint.
This analysis models a 1 GW (1,000,000,000 W) data center energy campus evaluated across three rack density configurations. Each scenario examines the trade-offs between power density, physical footprint, and relative project cost, giving infrastructure planners and investors a comparative framework for evaluating build strategy at gigawatt scale.
The three illustrative scenarios assume 200,000 W rack power density at 10,000, 15,000, and 20,000 racks respectively. Each configuration produces a distinct campus footprint and shell cost profile. The analysis isolates the vanilla powered shell cost (excluding energy and IT systems) to surface the structural and real-estate cost differential between configurations. Figures are indicative, forward-looking and not guaranteed; all projections are subject to definitive offering documents.
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · For investor relations inquiries, contact the Investor Relations team via the data room.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: Full-utilization ceiling across 378 clusters / 3,024 GPUs. Utilization haircuts of 20–35% are the primary sensitivity lever.
Full-utilization base case in illustrative revenue projections
Total GPUs across the three hardware tiers at target rental rates
Primary sensitivity lever for probability-weighted revenue scenarios
INVESTOR BRIEFING · Energycapitalx Infrastructure (ECXI) · Contact the Investor Relations team via the data room
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
TL;DR: ~307:1 committed-capital-to-project ratio · Full-utilization revenue ceiling across 378 clusters / 3,024 GPUs (illustrative, not guaranteed)
Contact: Investor Relations team, via the secure data room. Executive contact details are provided to qualified investors upon request.
Location: San Clemente, Orange County, CA (Southern California site)
Next step: Follow Cipherbit on LinkedIn and request the investor briefing pack through the data room. Materials are subject to definitive offering documents. Follow Cipherbit on LinkedIn
Energycapitalx LLC · Cipherbit LP · This material is for informational purposes only, does not constitute an offer or investment advice, and is subject to definitive offering documents.
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com
(c) 2015-2026 Energy Capital LLC. All Rights Reserved. webb@ecxii.com